1、 EVA waterproof board laying method: 1. Before construction, precise setting out should be carried out, standard lines should be marked for trial layi.
1、 EVA waterproof board laying method:
1. Before construction, precise setting out should be carried out, standard lines should be marked for trial laying, and joints should be minimized as much as possible.
2. Mark the centerline of the geotextile arch, align the centerline of the waterproof board with the centerline of the arch, and lay symmetrically from the arch to the two arch feet and side walls.
3. The EVA waterproof board adopts a nailless hot melt laying method, and the waterproof board is pasted onto the circular gasket of the plastic cushion using the hot melt method, so that the waterproof board has no mechanical damage.
4. After laying the geotextile, in order to prevent the reserved steel bars on the low side wall from damaging the waterproof board, plastic sleeves or plastic sheets should be used to cover the steel bar heads before laying the waterproof board.
2、 Safety precautions to pay attention to during the laying process:
1. During the construction of EVA waterproof boards, strict management should be carried out on fire sources and combustibles. Fire sources and combustibles should be separated, and EVA waterproof boards are strictly prohibited from being stored in tunnels, let alone as a stacking site.
2. Smoking should be prohibited within the construction scope of laying EVA waterproof boards and the words "No Fire" should be set up. The EVA waterproof board trolley should be equipped with fire extinguishers and the person responsible for fire prevention should be clearly identified.
3. Before laying the EVA waterproof board buffer layer, it is necessary to check whether the material is qualified, whether it has been excavated for a long time, and clean the leaked steel head and sharp corners; Prevent scratches on EVA waterproof boards and geotextiles during laying.
LATEST NEWS
Advantages of Laying Bentonite Waterproo
Firstly, lay a bentonite waterproof blanket at the bottom of the river, and backfill and compact 30cm thick soil on the waterproof blanket. Next, choose.
2023-11-10
Introduction to products of filament geo
Function of filament geotextile: 1. Isolation: refers to the use of filament geotextile to isolate building materials with different physical properties.
2023-11-10
Construction scheme of anti-seepage geom
The construction plan for the anti-seepage geomembrane of the reservoir: Qualified acceptance of the lower structure - Cleaning - Transportation of geome.
2023-11-10
The Application of GCL Bentonite Waterpr
1. After passing the inspection of the landscape greening foundation, a 100mm thick plain concrete cushion layer is poured as the base layer for laying the.
2023-11-10
The Benefits of Laying Bentonite Waterpr
Firstly, lay a bentonite waterproof blanket at the bottom of the river, and backfill and compact 30cm thick soil on the waterproof blanket. Next, choose.