The construction plan for the anti-seepage geomembrane of the reservoir: Qualified acceptance of the lower structure - Cleaning - Transportation of geome.
The construction plan for the anti-seepage geomembrane of the reservoir:
Qualified acceptance of the lower structure - Cleaning - Transportation of geomembrane - Spreading - Cutting of membrane - Trial welding - Formal welding - Welding quality inspection (non-destructive and destructive testing) - Paving of river cloth - Prefabricated concrete blocks for pressure protection.
The geotextile membrane is lifted by an 8-ton transport vehicle with its own lifting facilities, and manually spread and adjust the overlap width of the weld seam (10 cm).
The laying shall follow the sequence of "first in the middle, then around", "first at the head of the warehouse, then at the tail of the warehouse", and "continuous construction of adjacent blocks". Avoid forming a "cross" shaped joint during laying, and the distance between "T" shaped joints should not be less than 3m.
In order to further improve the quality control measures for geomembrane construction and enhance the applicability of geomembrane in the hydropower industry, the following suggestions are proposed in response to the selection of reservoir anti-seepage schemes for on-site construction, as well as the initial repair and treatment of water storage
(1) The quality of raw materials for geomembranes is crucial for their anti-seepage effect. It is necessary to strengthen the control of raw material ingredients, online monitoring and testing during the production process of geomembranes, and strictly prohibit the addition of backfill and filling materials during the production process.
(2) When using geomembrane for anti-seepage in the filling area at the bottom of the reservoir, full consideration should be given to the hazards caused by uneven settlement of the filling body, especially the treatment of the joint between the geomembrane and surrounding buildings, to avoid stress concentration caused by uneven deformation and tearing the geomembrane, thereby damaging the geomembrane anti-seepage system.
(3) Strengthen on-site construction management and protect the finished products of the geomembrane, strictly control the construction process, and prevent artificial damage to the geomembrane during or after the construction process.
LATEST NEWS
Advantages of Laying Bentonite Waterproo
Firstly, lay a bentonite waterproof blanket at the bottom of the river, and backfill and compact 30cm thick soil on the waterproof blanket. Next, choose.
2023-11-10
Introduction to products of filament geo
Function of filament geotextile: 1. Isolation: refers to the use of filament geotextile to isolate building materials with different physical properties.
2023-11-10
Construction scheme of anti-seepage geom
The construction plan for the anti-seepage geomembrane of the reservoir: Qualified acceptance of the lower structure - Cleaning - Transportation of geome.
2023-11-10
The Application of GCL Bentonite Waterpr
1. After passing the inspection of the landscape greening foundation, a 100mm thick plain concrete cushion layer is poured as the base layer for laying the.
2023-11-10
The Benefits of Laying Bentonite Waterpr
Firstly, lay a bentonite waterproof blanket at the bottom of the river, and backfill and compact 30cm thick soil on the waterproof blanket. Next, choose.
2023-11-10
Application of HDPE Geomembrane in Waste
HDPE geomembrane is a waterproof structure composed of HDPE locking strips, HDPE geomembrane, and geotextile, with two fabrics and one membrane. It is laid.