Release time:
2023-11-10 17:29:02
1. After the overall construction of the black film biogas digester is completed, enclosures should be added to prevent personnel from moving within the sco.
1. After the overall construction of the black film biogas digester is completed, enclosures should be added to prevent personnel from moving within the scope of the black film biogas digester (personnel are prohibited from walking on the covered membrane of the biogas digester except in special circumstances).
2. After the construction of the black film biogas digester is completed, if the biogas is not bulging and there is large surface water accumulation caused by rainy weather, drainage should be carried out immediately. If the depth of water accumulation exceeds 50cm, it will affect the service life of the biogas digester.
3. The inlet of the black film biogas digester is a channel for sewage to enter. It should be avoided as much as possible to prevent branches, plastic bags, and other debris from entering and causing blockage at the inlet. If blockage is encountered, it should be cleared promptly.
4. The slag discharge pipe is the discharge outlet of the biogas digester. Under normal operation of the biogas digester, the slag discharge operation needs to be carried out once every six months without a press, and once every year with a press. If there is a decrease in gas production and blackening of effluent quality before the slag discharge time, slag discharge should also be carried out.
5. The discharged biogas residue can be directly fed into the fish pond for feed treatment or used as farm manure. The amount of slag discharged each time is determined based on the actual situation on site. When no more waste slag is discharged from the slag outlet and black sewage is discharged, it is considered as the end of one slag discharge.
6. When the entire black film biogas digester operates normally, the biogas will fill the top membrane of the entire biogas digester to form a giant biogas bag. The amount of biogas stored in the bag can be adjusted according to the specific amount of biogas used (usually determined by the bulging height). Under normal circumstances, the bulging height of the biogas top membrane is 3-5 meters, and if it exceeds 5 meters, exhaust must be carried out.
7. If there is no exhaust, it is easy to cause the top membrane of biogas to pull out seriously from the anchoring ditch, which can cause the top membrane to rupture, thereby affecting the service life of biogas.
7. The biogas outlet is the pathway for the discharge of biogas from the biogas digester. Due to the large amount of water vapor contained in the biogas, over time, water vapor will condense on the pipe wall, forming water droplets and blocking the exhaust pipe. This requires drainage of the exhaust pipe.
8. In general, drainage should be carried out once a month, and if biogas cannot be discharged, drainage should be carried out immediately.
LATEST NEWS
Advantages of Laying Bentonite Waterproo
Firstly, lay a bentonite waterproof blanket at the bottom of the river, and backfill and compact 30cm thick soil on the waterproof blanket. Next, choose.
2023-11-10
Introduction to products of filament geo
Function of filament geotextile: 1. Isolation: refers to the use of filament geotextile to isolate building materials with different physical properties.
2023-11-10
Construction scheme of anti-seepage geom
The construction plan for the anti-seepage geomembrane of the reservoir: Qualified acceptance of the lower structure - Cleaning - Transportation of geome.
2023-11-10
The Application of GCL Bentonite Waterpr
1. After passing the inspection of the landscape greening foundation, a 100mm thick plain concrete cushion layer is poured as the base layer for laying the.
2023-11-10
The Benefits of Laying Bentonite Waterpr
Firstly, lay a bentonite waterproof blanket at the bottom of the river, and backfill and compact 30cm thick soil on the waterproof blanket. Next, choose.
2023-11-10
Application of HDPE Geomembrane in Waste
HDPE geomembrane is a waterproof structure composed of HDPE locking strips, HDPE geomembrane, and geotextile, with two fabrics and one membrane. It is laid.
2023-11-10